Summary for Quinn

Average Performance Score: 76%

Download (CSV)

Date School Targets Days Students Lessons Hours Minimum Needed Found Online Updated Health Note
06-02-2026 Amagoro 0 0 0 0%
-
13-02-2026 Amagoro 0 0 0 0%
-
20-02-2026 Amagoro 25 25 25 🔴 76%
-
27-02-2026 Amagoro 0 0 0 0%
Mid term
06-03-2026 Amagoro 0 0 0 0%
-
13-03-2026 Amagoro 32 29 27 🟡 89%
-
20-03-2026 Amagoro 32 29 26 🟡 88%
-
27-03-2026 Amagoro 0 0 0 0%
-
03-04-2026 Amagoro 0 0 0 0%
-
01-05-2026 Amagoro 0 0 0 0%
-
08-05-2026 Amagoro 30 30 26 🟡 87%
-
15-05-2026 Amagoro 31 0 0 🟡 31%
-
22-05-2026 Amagoro 32 29 25 🟡 87%
-
29-05-2026 Amagoro 0 0 0 0%
-
05-06-2026 Amagoro MET 5d 329 32 19.4h 30 33 25 25 21 🔴 72%
-
12-06-2026 Amagoro MET 5d 392 38 21.7h 30 33 30 0 0 🟡 30%
-
19-06-2026 Amagoro 34 31 27 🟡 90%
The three laptops didn’t have power when I was taking the stats
26-06-2026 Amagoro MISS 3d 41 10 7.5h 30 33 33 33 29 🟡 96%
Half-term break
03-07-2026 Amagoro 34 33 29 🟡 94%
-
10-07-2026 Amagoro MET 5d 344 31 19.4h 30 33 32 32 28 🟡 93%
-
17-07-2026 Amagoro MISS 5d 0 5 10.0h 30 33 0 0 0 0%
-
24-07-2026 Amagoro 0 0 0 0%
-
31-07-2026 Amagoro MISS 6d 0 6 6.9h 30 33 0 0 0 0%
-
03-08-2026 Amagoro 0 0 0 0%
August holiday
How are these rankings calculated?

Our health rankings are based on the number of Found devices compared to the school’s Largest Planned Group and the required Buffer.

Ranking System

  • 🟢 Healthy: You’ve hit the Largest Planned Group requirement with healthy devices (Online and Updated ≥ LPG).
  • 🟡 Needs Work: You have reached the minimum count of devices required but need to address updates or online status.
  • 🔴 Critically Low: Fewer than the minimum devices were found.
  • Missing: No report was submitted for this period.
  • Holiday: A known exception (like mid-term or school holiday) is active.

The Performance Score (%) is a combined metric that also considers how many devices are Online and Updated.